The New Master Suite

I am so excited to give you a tour of our new attic! This is the space after the walls were built, electrical ran, hvac installed and the foam insulation was sprayed.

The view going up! Look how bright it is!

The view of our bedroom from our new office.

The view to our backyard from the bedroom wall our bed will be on. I can't wait to make a reading corner or sewing spot in that far corner.

Stairs and office on the left. Bathroom and Walk-in closet on the right.

Bathroom entry

View of bedroom from the window. Our bed will be on that long wall on the left. We may turn it into a built-in unit wall at a later date.

Bathroom! Soaking tub, large glassed in shower and double sink vanity to come! Love that window!

You may have noticed the odd looking walls. We opted for foam insulation, which is sprayed in. This type of insulation is really neat for it completely incapsulates everything, forming a "shell" and a very efficient barrier wall against any air leaks. It also saved us several inches of head room, which we felt was crucial for our space.

Sunday, September 27, 2009

The Original Attic


Here is a picture of what our attic originally looked like. The stairwell is off our Living Room and comes up in the center of the north side of the house. It was pretty much a large square room with a hard wood floor, brick walls, slopping ceilings and cruddy windows. It had great potential but was very dark.

The reason why previous homeowners had not renovated was because the upstairs floor was originally built with 2x6 joists and code today is 2x10. This meant that the entire wood floor had to be removed.....

....so that it could be reinforced with 2x10s from the front roof peak to the back. A very labor intensive job and a tricky feat since it meant exposing all the plaster keys and risking the chance of cracking/breaking our plaster ceilings below. This step seemed like an impossible feat and I envisioned gaping holes in my ceilings downstairs. I'm pleased to say that it went very well and we only have a few new cracks. Nothing that cannot be repaired or isn't expected in a plaster house built in 1936.

All the old lumber and new lumber was hoisted in through the tiny window visible in the previous pictures.

A hole had to be cut in our back roof to set the beams directly on our exterior wall so that they would properly support the 19 ft. dormer.

Our stairwell leading downstairs.


A picture from the other side of the room facing the stairwell after the floors had been completed and plywood laid. The next step was the dormer. See my post from last July.

Saturday, September 26, 2009

Basement Stage 2

I'm back!!! So sorry for the delay in posts lately. Renovation has officially consumed our lives. I am so eager to share our progress with you, so I'm going to continue with the basement and hope to post something new each day until you are up to speed.


I left off with showing you the sexy new sewer pipe. Well, once the cement dried the next step was to set new posts and beams in the basement to ensure the house would remain standing with the additional level. Our home is fully brick, however, I'm not one to test the whole huff and puff theory with my family inside, so, we contacted an engineering friend who now has us built to withstand the next midwest "hurrinado."

We had five new holes to dig and posts to set in the basement. It started out like this. Ignore the extra lines Contractor C got a little spray paint happy!


Then the boys got to work cutting and digging up the concrete AGAIN! I must say the dedication and hard work ethic the men in my family have just blows me away. They dug all these holes and had to remove all the cement/rock/mud in buckets out a tiny basement window! Unbelievable! Then the rebar was set.

Does this help put it into perspective? I couldn't get hole number 5 in the shot.

Then they had to fill the holes with cement. This job was so big that we rented a little Bob the Builder "Dizzy" cement mixer (it was really cute) and they built a shoot to drop in from outside. It was also quite impressive. Shout out to our friend Matt in Mobile, AL whose in the yellow. He and Chad had a very dusty and dirty job of mixing the cement outside.

Here's what they looked liked filled with the first layer.

Here is the finished product. Now just picture it with a black pole in the middle of the square. My father brought in a welder to weld the posts to the ceiling and I'm relieved to share that he managed to not set my house or storage items on fire. He did have one close call though, and the fire alarm let him know about it! He tried to deny a problem but the smell of smoke gave him away!